{"id":40504,"date":"2026-08-23T18:03:44","date_gmt":"2026-08-23T08:03:44","guid":{"rendered":"http:\/\/www.16news.com.au\/?p=40504"},"modified":"2026-08-23T18:03:44","modified_gmt":"2026-08-23T08:03:44","slug":"making-molesworth-street-bridge-more-resilient-to-severe-weather","status":"publish","type":"post","link":"http:\/\/www.16news.com.au\/index.php\/2026\/08\/23\/making-molesworth-street-bridge-more-resilient-to-severe-weather\/","title":{"rendered":"Making Molesworth Street Bridge more resilient to severe weather"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The future of one of Tenterfield\u2019s key transport links is taking shape, with construction starting on the new Molesworth Street concrete bridge over Tenterfield Creek, paving the way for a safer, more resilient and reliable crossing for the community.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Albanese and Minns Governments are providing more than $9.9 million through the Regional Roads and Transport Recovery Package under the jointly funded Disaster Recovery Funding Arrangements to improve the bridge\u2019s resilience to future floods and natural disasters.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This project, delivered by Tenterfield Shire Council, will replace an old bridge over Tenterfield Creek damaged in the February and March 2022 floods. Work on the new 49-metre, three-span concrete bridge will commence on Monday 24 August.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project will also include the replacement of the sewer line with an upgraded creek crossing including new support structure. There will be a shared pedestrian and cycle path on the bridge, creating a safer route for motorists, pedestrians and cyclists.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">There will also be upgrades to the Molesworth Street approaches and sections of the Tenterfield Township Shared Cycleway to seamlessly connect with the new bridge.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">To allow works to be carried out safely, temporary traffic and pedestrian changes will be in place throughout construction. Molesworth Street will be closed to through-traffic between Scott Street and Duncan Street for the duration of the works.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Access for local residents and the Tenterfield Bowling Club will be maintained at all times.<br>Preliminary work on the bridge replacement was carried out in July 2024 with geotechnical work to inform the design of the bridge redevelopment.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">We thank the community for their patience and understanding while this important infrastructure upgrade is delivered.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Federal Minister for Emergency Management Kristy McBain<\/strong>:\u00a0<br>\u201cThis is an exciting project for residents, commuters and freight operators travelling on Molesworth Street Bridge, which provides an important link to New England and beyond.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThe Albanese and Minns governments are proud to be investing in building infrastructure so that it\u2019s even better than before, to withstand severe weather events like storms and flooding.<br><br>\u201cThis recovery approach means roads and other transport assets may be able to stay open longer during a disaster and reopen soon after the disaster has passed, speeding up recovery for local communities.\u201d<br><br><strong>NSW Minister for Roads and Regional Transport, Jenny Aitchison<\/strong>:\u00a0<br>\u201cDelivering a stronger and more reliable Molesworth Street Bridge is about putting the safety of the Tenterfield community first.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThe new bridge will provide a safer crossing for everyone who relies on it every day, and most importantly, it will keep people connected when it matters most.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cFollowing damage caused by the 2022 floods, this investment will give the community a piece of infrastructure that will serve families for years to come.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>NSW Minister for Recovery and Member for Lismore, Janelle Saffin<\/strong>:\u00a0<br>\u201cAs the local member, I have driven and walked over the Molesworth Street Bridge many times, and I know firsthand just how vital this crossing is for our Tenterfield community.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThis project is about building back better. Ensuring our infrastructure is built to withstand future severe weather events so local residents, businesses, and emergency services stay connected during disasters.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cBy bringing all three levels of government together, we are supporting Tenterfield Shire Council to deliver this crucial $9.9-million project. Working side by side, we are giving our community the safer, more resilient infrastructure it deserves.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Senator for NSW Tim Ayres<\/strong>:<br>\u201cGood infrastructure makes a real difference to everyday life, and this new bridge will be an important asset for the Tenterfield community for years to come.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThis joint investment from the Australian and New South Wales governments is helping deliver practical improvements that will make it easier and safer for local residents, businesses and visitors to get around town.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Mayor Bronwyn Petrie<\/strong>:<br>&#8220;It\u2019s exciting to see the Molesworth Street Bridge Replacement Project is underway.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThis is an important project for Tenterfield that will deliver long-term benefits for our community. Once complete, the new bridge will improve safety and accessibility while providing a better connection for residents, visitors and road users.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cCouncil is grateful for the support of the Australian and NSW governments in&nbsp;making this project possible. We appreciate these works will cause some temporary inconvenience, and I thank residents, businesses and road users for their patience and understanding while construction is carried out.\u201d<br>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The future of one of Tenterfield\u2019s key transport links is taking shape, with construction starting on the new Molesworth Street concrete bridge over Tenterfield Creek, paving the way for a safer, more resilient and reliable crossing for the community. The Albanese and Minns Governments are providing more than $9.9 million through the Regional Roads and &hellip; <a href=\"http:\/\/www.16news.com.au\/index.php\/2026\/08\/23\/making-molesworth-street-bridge-more-resilient-to-severe-weather\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Making Molesworth Street Bridge more resilient to severe weather&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-40504","post","type-post","status-publish","format-standard","hentry","category-nswnews"],"_links":{"self":[{"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/posts\/40504","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/comments?post=40504"}],"version-history":[{"count":1,"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/posts\/40504\/revisions"}],"predecessor-version":[{"id":40505,"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/posts\/40504\/revisions\/40505"}],"wp:attachment":[{"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/media?parent=40504"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/categories?post=40504"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/tags?post=40504"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}