{"id":31460,"date":"2025-02-19T20:52:18","date_gmt":"2025-02-19T20:52:18","guid":{"rendered":"http:\/\/www.16news.com.au\/?p=31460"},"modified":"2025-02-19T20:52:18","modified_gmt":"2025-02-19T20:52:18","slug":"faster-water-approvals-to-supercharge-housing-delivery","status":"publish","type":"post","link":"http:\/\/www.16news.com.au\/index.php\/2025\/02\/19\/faster-water-approvals-to-supercharge-housing-delivery\/","title":{"rendered":"Faster water approvals to supercharge housing delivery"},"content":{"rendered":"\n<p>The Minns Labor Government is slashing red tape to get more homes built faster across the state, unveiling a clear blueprint to speed up approvals and ensure new properties are connected and ready to turn on the tap sooner.<\/p>\n\n\n\n<p>The Housing Approval Reform Action Plan is a joint initiative between the NSW Department of Climate Change, Energy, the Environment and Water (DCCEEW), Sydney Water, and WaterNSW to streamline approvals and accelerate the delivery of critical infrastructure.<br><br>After more than a decade of underinvestment and stalled approvals, the NSW Government is taking action, establishing a cross-government team to fast-track water and wastewater infrastructure, ensuring developments stay on track and homes are delivered sooner.<br><br>Every new home requires essential infrastructure. From providing drinking water and wastewater management to handling stormwater, a robust water cycle management plan is a key factor in assessing land use and development proposals in NSW.<br><br>Government agencies evaluate a wide range of potential impacts on water quality, including stormwater management, erosion and sediment control during construction and wastewater disposal.<br><br>Beyond accelerating housing construction, the plan will focus on protecting, enhancing, and restoring waterways and water sources to ensure long-term sustainability.<br><br><strong>The Housing Approval Reform Action Plan streamlines housing delivery and eases system pressure through clear actions, including:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Expanding risk-based triaging for all referrals to ensure homes that are ready can be connected without delay.<\/li><li>Streamlining the removal of groundwater process on building sites to ensure construction can commence quickly and safety.<\/li><li>Revising key performance indicators&nbsp;to mitigate inefficiencies.<\/li><li>Support developers and Water Servicing Coordinators in getting their applications right from<br>the start.<\/li><li>Facilitating early engagement for smoother applications.<\/li><\/ul>\n\n\n\n<p>Following an industry forum in August 2024, these reforms were shaped with key stakeholders and construction industry leaders, who highlighted real-world obstacles slowing housing development, to break down barriers and get more homes built faster.<br><br><strong>This action plan strengthens the Minns Labor Government\u2019s commitment to building a better NSW, including:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>$2.2 billion infrastructure investment to fund more housing, critical infrastructure and better planning for housing.<\/li><li>Over $250 million to continue the overhaul of the planning system and planning reforms.<\/li><li>The development of the NSW Pattern Book and accelerated planning pathway for those who use the pre-approved patterns.<\/li><li>$5.1 billion to build 8,400 new public homes, the largest investment in social and affordable housing.<\/li><li>Creation of Housing Delivery Authority that recently announced plans to fast-track the delivery of 6,400 new homes.<\/li><\/ul>\n\n\n\n<p>To learn more, please visit:&nbsp;<a href=\"https:\/\/water.dpie.nsw.gov.au\/our-work\/plans-and-strategies\/housing-approval-reform-action-plan\/_nocache\" rel=\"noreferrer noopener\" target=\"_blank\">https:\/\/water.dpie.nsw.gov.au\/our-work\/plans-and-strategies\/housing-approval-reform-action-plan\/<\/a><br><br><strong>Minister for Housing and Water Rose Jackson said:<\/strong><br><br>\u201cDrinking water, wastewater and stormwater might not be front of mind, but they\u2019re make-or-break for getting homes built and ready to live in.<br><br>\u201cWe\u2019re cutting red tape, speeding up approvals, and pulling every lever we\u2019ve got to get more homes on the ground faster\u2014because NSW can\u2019t afford delays.<br><br>\u201cThis plan is about fixing the system. The entire NSW water sector has come together with developers to find solutions that actually work and get things moving.<br><br>\u201cThese are practical changes that will slash approval timeframes and address industry concerns\u2014while still doing the right thing by our water sources and environment.\u201d<br><br><strong>NSW Executive Director of the Property Council of Australia Katie Stevenson said:<\/strong><br><br>\u201cWhen applications for apartment buildings get the stamp of approval from planning, there are often further strings attached where significant excavations need additional sign-off from water authorities and this adds costly further delays to the delivery of new housing.<br><br>\u201cToday&#8217;s announcement effectively declares 2025 as a year of cultural change for the three water authorities involved in the pre-construction approval of new housing &#8211; it is the sort of leadership we need to align all aspects of the government&#8217;s activities toward the resolution of the housing crisis.<br><br>\u201cWe appreciate the priorities outlined in the action plan, along with the specific activities and timelines it includes, which have been created through extensive consultation with the industry.\u201d<br>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Minns Labor Government is slashing red tape to get more homes built faster across the state, unveiling a clear blueprint to speed up approvals and ensure new properties are connected and ready to turn on the tap sooner. The Housing Approval Reform Action Plan is a joint initiative between the NSW Department of Climate &hellip; <a href=\"http:\/\/www.16news.com.au\/index.php\/2025\/02\/19\/faster-water-approvals-to-supercharge-housing-delivery\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Faster water approvals to supercharge housing delivery&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-31460","post","type-post","status-publish","format-standard","hentry","category-nswnews"],"_links":{"self":[{"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/posts\/31460","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/comments?post=31460"}],"version-history":[{"count":1,"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/posts\/31460\/revisions"}],"predecessor-version":[{"id":31461,"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/posts\/31460\/revisions\/31461"}],"wp:attachment":[{"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/media?parent=31460"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/categories?post=31460"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/tags?post=31460"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}