{"id":19656,"date":"2022-12-21T02:46:01","date_gmt":"2022-12-21T02:46:01","guid":{"rendered":"http:\/\/www.16news.com.au\/?p=19656"},"modified":"2022-12-21T02:46:01","modified_gmt":"2022-12-21T02:46:01","slug":"phoenix-pumped-hydro-project-progresses-with-7-million-grant","status":"publish","type":"post","link":"http:\/\/www.16news.com.au\/index.php\/2022\/12\/21\/phoenix-pumped-hydro-project-progresses-with-7-million-grant\/","title":{"rendered":"Phoenix Pumped Hydro Project Progresses with $7 million grant"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Up to 400,000 NSW households could soon be powered by renewable electricity generated at the Phoenix Pumped Hydro station after the project received&nbsp;$7 million&nbsp;in support from the NSW Government&nbsp;to progress feasibility studies.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Phoenix Pumped Hydro project, located at the Burrendong Dam, near Wellington and within the Central West Orana REZ, will provide 810MW of capacity and storage for up to 12 continuous hours of electricity generation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Minister for Energy Matt Kean said pumped hydro will form an essential building block of the electricity system of the future.&nbsp;<br><br>\u201cPumped hydro acts like a giant battery for the electricity system. It works by using surplus renewable energy to pump water up a hill when it is sunny and windy, and releasing the water back down the hill through giant turbines that create electricity when it is still and dark,\u201d Mr Kean said.<br><br>\u201cBringing the grant funding and development access together will play a key role in fast-tracking the development of pumped hydro, which will be critical to replace our ageing coal fire power stations.\u201d<br><br>Minster for Lands and Water Kevin Anderson said through the WaterNSW\u2019s Renewable Energy and Storage Program, WaterNSW is looking at ways to leverage its land and assets to deliver benefits for future energy security and its customers.&nbsp;<br><br>\u201cWaterNSW is looking to the market to identify renewable generation and storage opportunities on WaterNSW land and assets,\u201d Mr Anderson said.<br><br>\u201cI\u2019m really excited by this opportunity for WaterNSW to work hand in hand with government to support the renewable energy transition and at the same time look for innovative ways to keep our customers\u2019 bills as low as possible.\u201d&nbsp;<br><br>The project will be funded by the NSW Pumped Hydro Recoverable Grants Program and a Development Agreement under WaterNSW\u2019s Renewable Energy and Storage Program.<br><br>It\u2019s expected to be operational by 2030 and would play a key role in providing dispatchable, long duration storage to support energy market security.<br><br>The NSW Government committed a further $24 million to the Pumped Hydro Recoverable Grants Program in the June Budget. This funding is expected to expand the pipeline of pumped hydro projects that can make competitive bids for Long-Term Energy Service Agreements for long duration storage.<br><br>The NSW Government will also invest $23.5 million to undertake feasibility studies to develop pumped hydro projects on key WaterNSW assets throughout the State. The outcomes of these feasibility studies and the potential opportunities will be made available to the private sector in early 2023.&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Up to 400,000 NSW households could soon be powered by renewable electricity generated at the Phoenix Pumped Hydro station after the project received&nbsp;$7 million&nbsp;in support from the NSW Government&nbsp;to progress feasibility studies. The Phoenix Pumped Hydro project, located at the Burrendong Dam, near Wellington and within the Central West Orana REZ, will provide 810MW of &hellip; <a href=\"http:\/\/www.16news.com.au\/index.php\/2022\/12\/21\/phoenix-pumped-hydro-project-progresses-with-7-million-grant\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Phoenix Pumped Hydro Project Progresses with $7 million grant&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-19656","post","type-post","status-publish","format-standard","hentry","category-nswnews"],"_links":{"self":[{"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/posts\/19656","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/comments?post=19656"}],"version-history":[{"count":1,"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/posts\/19656\/revisions"}],"predecessor-version":[{"id":19657,"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/posts\/19656\/revisions\/19657"}],"wp:attachment":[{"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/media?parent=19656"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/categories?post=19656"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/tags?post=19656"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}