{"id":10349,"date":"2021-02-19T07:59:56","date_gmt":"2021-02-19T07:59:56","guid":{"rendered":"http:\/\/www.16news.com.au\/?p=10349"},"modified":"2021-02-19T07:59:56","modified_gmt":"2021-02-19T07:59:56","slug":"action-on-wallsend-flooding-as-space-made-for-stormwater-channel-widening","status":"publish","type":"post","link":"http:\/\/www.16news.com.au\/index.php\/2021\/02\/19\/action-on-wallsend-flooding-as-space-made-for-stormwater-channel-widening\/","title":{"rendered":"Action on Wallsend flooding as space made for stormwater channel widening"},"content":{"rendered":"<div class=\"inner-head\">\n<div class=\"clearfix\">\n<div class=\"date-info\"><\/div>\n<div class=\"pull-right right-icons\">\n<div class=\"share\"><img decoding=\"async\" class=\"HeroImage\" src=\"https:\/\/www.newcastle.nsw.gov.au\/Newcastle\/media\/Images\/News\/2%20Media%20Release%20images\/Ironbark-Creek-Channel-at-Nelson-Street-Bridge_web.jpg?ext=.jpg\" alt=\"\" \/><\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"inner-desc\">\nCity of Newcastle is taking further steps to facilitate works to mitigate flooding in the Wallsend town centre with tenders called to demolish the vacant building next to Nelson Street bridge, which will allow the future widening of Hunter Water\u2019s Ironbark Creek stormwater channel.<br \/>\nWidening the Hunter Water channel and replacing the Tyrrell Street, Nelson Street and Boscawen Street bridges are key elements of the Ironbark Creek Flood Mitigation Plan.<br \/>\nNewcastle Lord Mayor Nuatali Nelmes said the demolition is an essential step to allow the stormwater channel to be widened and avoid the catastrophic flooding that has occurred on a number of occasions since the Pasha Bulker storm in 2007.<br \/>\n\u201cDemolishing this building which we strategically acquired in 2018 is part of our more than $20 million commitment to address flooding in Wallsend,\u201d Cr Nelmes said.<br \/>\n\u201cThe building is directly adjacent to the stormwater channel and the Nelson Street bridge, and its removal will enable future construction of an upgraded Nelson Street bridge, as well as future widening of Hunter Water\u2019s channel to 21 metres, which takes in approximately half the width of the building\u2019s footprint.<br \/>\n\u201cWe\u2019re continuing to work with Hunter Water as the asset owners of the channel on funding for a capital program to widen its stormwater channel to help us protect people and property exposed to the dangers and damage of flooding.<br \/>\n\u201cExpansion of the stormwater channel, together with our replacement and raising of the Nelson and Boscawen Street bridges and upgrade of the culvert beneath Cowper Street Bridge, will significantly reduce flooding in the town centre.<br \/>\n\u201cWe are committed to delivering the Ironbark Creek Flood Mitigation Plan in conjunction with significant amenity upgrades to the Wallsend town centre, which will support businesses and residents.\u201d<br \/>\nA new Tyrrell Street Bridge was opened in April last year following the City\u2019s $3.3 million replacement of the original 1930 built structure.<br \/>\nIt is expected that demolition of the building on Nelson Street will take place in the coming months.<br \/>\nDetailed design of the replacement and raising of the Nelson and Boscawen Street bridges is scheduled to commence later in 2021.\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>City of Newcastle is taking further steps to facilitate works to mitigate flooding in the Wallsend town centre with tenders called to demolish the vacant building next to Nelson Street bridge, which will allow the future widening of Hunter Water\u2019s Ironbark Creek stormwater channel. Widening the Hunter Water channel and replacing the Tyrrell Street, Nelson &hellip; <a href=\"http:\/\/www.16news.com.au\/index.php\/2021\/02\/19\/action-on-wallsend-flooding-as-space-made-for-stormwater-channel-widening\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Action on Wallsend flooding as space made for stormwater channel widening&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"class_list":["post-10349","post","type-post","status-publish","format-standard","hentry","category-newcastle"],"_links":{"self":[{"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/posts\/10349","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/comments?post=10349"}],"version-history":[{"count":0,"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/posts\/10349\/revisions"}],"wp:attachment":[{"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/media?parent=10349"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/categories?post=10349"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.16news.com.au\/index.php\/wp-json\/wp\/v2\/tags?post=10349"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}